Design, Supply and Installation for ACMV layout plan, Cooling load calculation, equipment selection, equipment schedule preparation, duct size calculation, copper pipe & drain pipe size selection, Installation Detailed Drawings Preparation, Method of Statement, Risk Assessment, Safe Work Procedure, Coordination work with other services, As Built Drawings, Operation and Maintenance Manual till to hand over